Here's an article I came across which I thought was worth sharing with you:
http://ift.tt/1ulwBMJ
via Readability (This post was formatted automatically by IFTTT, so apologies if I haven't tidied it up yet. TK)
The most urgent jobs tend to be line jobs. Profit and loss. Schedules to be drawn and honored. Projects to deliver. The line manager initiates. The line manager delivers. Staff jobs are important, no…
http://ift.tt/1ulwBMJ
via Readability (This post was formatted automatically by IFTTT, so apologies if I haven't tidied it up yet. TK)